Aussenkehr Settler

Client: Namwater
Process Engineer: Aquarius Consult
Structural / Mechanical Engineer: Metallum Fabrication in partnership with Axis Mechanical Design
Material: 304 Stainless Steel
Dimensions: 9m Long x 4.5m High x 2.8m Wide
Treatment Flow Rate: 66 m3/h


Two Lamella Tube settlers specifically design for Namwater to treat 66m3/h incoming flow in an upflow pattern. Manufactured in house from 304 stainless steel, transported to site as abnormal load and assembled on site in Aussenkehr.

QKR Navachab Clarifier

Client: QKR Navachab Gold Mine
Process Engineer: Aquarius Consult
Structural / Mechanical Engineer: Axis Mechanical Design
Material: 304 Stainless Steel
Dimensions: tbd
Treatment Flow Rate: tbd

High Rate Sludge Contact Clarifier specifically developed for softening and fine suspended solids removal at QKR Navachab Gold Mine. Clarifier consists of 5 mixing tanks, each with own mixer and one main tank with picket fence mixer. Entire unit built in house, transported to as abnormal load and assembled on site.